彩乐乐网

彩53彩票网 万人炸金花 新橙彩票 电子游戏 360彩票 中国福彩网 一定牛彩票网 精选四肖三码 白小姐四肖必选一肖四不像 六肖中特精选

window._bd_share_config = { "common": { "bdSnsKey": {}, "bdText": "", "bdMini": "2", "bdMiniList": false, "bdPic": "", "bdStyle": "0", "bdSize": "16" }, "slide": { "type": "slide", "bdImg": "0", "bdPos": "left", "bdTop": "123.5" }, //"image":{"viewList":["qzone","tsina","tqq","renren","weixin"],"viewText":"分享到:","viewSize":"16"}, share : [{"tag":"share_1","bdSize" : 16}]};with(document)0[(getElementsByTagName('head')[0]||body).appendChild(createElement('script')).src='/static/api/js/share.js?v=89860593.js?cdnversion='+~(-new Date()/36e5)];
Product showroom collection of the shop

Hello Login Registration

current position:
Qingdao Oriental Star Plastic Machinery Co., Ltd. > Plastic sheet equipment > Plastic sheet production line > PVC crystal plate production line Plastic sheet equipment specifications 600mm

PVC crystal plate production line plastic sheet equipment specifications 600mm

Back to list page
  • PVC Crystal Plate Production Line Plastic Sheet Equipment Specification 600mm

Favorite Report
price CN ¥ 315000
  • model
  • Brand
  • 生产商 Manufacturer nature
  • 青岛市 Qingdao City

Updated: 2019-07-24 16:15:54 Views: 578

When you contact us, please indicate that the information you see on Plastic Machinery Online, thank you!

Product introduction

The surface of the PVC crystal soft glass is lustrous, flawless, soft, no cracks, no odors, no bubbles, fine production, widely used; soft cold resistance, wear resistance, acid and alkali resistance, corrosion resistance, excellent tear resistance, weldability , Physical properties are better than rubber and other coils; used in chemical, electroplating, electrolytic tank linings, insulation pads, trains, automotive interiors and auxiliary materials; operating temperature range from minus 15 degrees Celsius to 60 degrees Celsius, can be bonded, welding. Easy to clean, meet modern people's requirements for green health and fashion.

Detailed introduction

PVC crystal plate production line consists of the following equipment:

1.Screw feeder + hot air dryer

2.SJ75-30 / 1 extruder

3.DK-18 electronic control system

4.MJ-200 / 300 smooth plate mould

BF-900X∮320三辊压光机 5. BF-900X∮320 three-roller calender

6.BF-900-000 cooling water tank

7.BF-900X∮200 rubber roller tractor

8.BF-700 Winder

The main components of the entire line are well-known brands at home and abroad:

  • The electrical system uses Siemens contactors, Omron intelligent temperature controllers, and ABB inverters.
  • Hard tooth surface reducer adopts high-torque gear reducer for plastic machine. .
  • Screw barrel adopts domestic ten * Zhejiang Jinxing or Jinteng screw

The mirror roller is made by Changzhou Lianfeng Machinery or Xuzhou Saite Machinery.

Service and commitment

1. Provide the purchaser with a schematic diagram of the installation of the complete set of equipment; and according to the purchaser's request, send a technician to the purchaser to guide the installation, commissioning of equipment, and train operators until the purchaser's operators can independently produce qualified products.

2. The purchaser shall, according to the foundation installation drawing provided by the supplier, the user-supplied list of auxiliary facilities and the material purchase guide, make preparations for the installation of the equipment, and actively cooperate with the work of the service personnel of the supplier. The gas path is laid to the designated position according to the actual requirements during installation, and all materials for production are prepared. If the test conditions are not met, the supplier test personnel will return.

3. The supplier's service personnel will leave the factory within 3-5 days after receiving the installation notice from the purchaser (special circumstances such as foreign customers will be discussed separately).

4. Equipment operation direction and appearance paint color can be requested by the buyer.

5. The subsequent maintenance of the product or the accessories only cost the cost, and provide the buyer with * production process technical services.

设备安装调试期间,所产生的土、木、建及机械设备吊装费用均有需方负责 6. During the installation and commissioning of the equipment, the buyer shall be responsible for the costs of earth, wood, construction and machinery equipment lifting.

- 8日(不含路途往返,国外客户需方负责调试人员的往返机票及劳动报酬)需方负责调试人员的吃住及安全问题。 7. Under normal circumstances, the commissioning is 5-8 days (excluding round trips, foreign customers need to be responsible for commissioning personnel's round-trip air tickets and labor compensation). The buyer is responsible for the accommodation and safety issues of the commissioning personnel.

Other recommended products

More
The above information is provided by the enterprise itself, and the authenticity, accuracy and legality of the information content are the responsibility of the relevant enterprise. Plastic Machinery Network does not assume any responsibility for this.
Tips: In order to avoid purchasing risks, it is recommended that you confirm the supplier's qualification and product quality before purchasing products.
or

Favorite the shop

Please log in before collecting

prompt

Your message has been submitted successfully! We will reply you as soon as possible ~
product comparison QR code Feedback

Scan to visit mobile phone shops
Leave message