彩乐乐网

彩53彩票网 万人炸金花 新橙彩票 电子游戏 360彩票 中国福彩网 一定牛彩票网 精选四肖三码 白小姐四肖必选一肖四不像 六肖中特精选

window._bd_share_config = { "common": { "bdSnsKey": {}, "bdText": "", "bdMini": "2", "bdMiniList": false, "bdPic": "", "bdStyle": "0", "bdSize": "16" }, "slide": { "type": "slide", "bdImg": "0", "bdPos": "left", "bdTop": "123.5" }, //"image":{"viewList":["qzone","tsina","tqq","renren","weixin"],"viewText":"分享到:","viewSize":"16"}, share : [{"tag":"share_1","bdSize" : 16}]};with(document)0[(getElementsByTagName('head')[0]||body).appendChild(createElement('script')).src='/static/api/js/share.js?v=89860593.js?cdnversion='+~(-new Date()/36e5)];
Product showroom collection of the shop

Hello Login Registration

current position:
Qingdao Dongfangzhixing Plastic Machinery Co., Ltd. > Plastic Machinery Equipment > Plastic sheet production line > Transparent curtain curtain production line plastic sheet equipment specifications 1220mm

Transparent curtain production line plastic sheet equipment specifications 1220mm

Back to list page
  • Transparent curtain production line Plastic sheet equipment Specification 1220mm

Favorite Report
price 600000.00
  • model
  • Brand
  • 生产商 Manufacturer nature
  • 青岛市 Qingdao City

Updated: 2019-09-19 15:36:15 Views: 400

When you contact us, please indicate that the information you see on Plastic Machinery Online, thank you!

Product introduction

The soft curtains produced by the translucent curtain production line are currently recognized as insulation systems. They are transparent, soft, resistant to acids and alkalis, and adapt to large temperature differences. They are widely used in food and beverages, brewing medicine, textiles, printing, electronic instruments, storage, cold storage, shopping malls, hotels. , Heat preservation, heat insulation, dustproof, fly-proof, noise reduction and other industries.

Detailed introduction

Transparent curtain production line equipment list

1

Spiral feeding machine + hot air dryer

1 set

2

SJ120-30 / 1 extruder

1 set

3

DK-22 electronic control system

1 set

4

MJ-1400 sheet mold (2 sets of mold lips)

1 set

5

BF-1450X∮400 three-roller calender

1 set

6

BF-1400-8000 cooling bracket

1 set

7

BF-1400X∮240 rubber roller tractor

1 set

8

BF-1220 Winder

1 set

9

Random equipment technical information

1 serving

The main components of the whole production line of transparent curtain production line are well-known brands at home and abroad:

  • The electrical system adopts Siemens contactor, Omron intelligent temperature controller, and Flextronics frequency converter.
  • Hard tooth surface reducer adopts high-torque gear reducer for plastic machine. .
  • Screw barrel adopts domestic ten * Zhejiang Jinxing or Jinteng screw
  • Sheet mold adopts Zhejiang Toto precision mold

The mirror roller is made by Changzhou Lianfeng Machinery or Xuzhou Saite Machinery.

Service and commitment

1. Provide the purchaser with a schematic diagram of the installation of the complete set of equipment; and according to the purchaser's request, send a technician to the purchaser to guide the installation, commissioning of equipment, and train operators until the purchaser's operators can independently produce qualified products. 2. After the installation is completed and the test conditions are available, the training of the equipment operator is provided by the supplier at the site of the buyer when needed.

3. The purchaser shall, according to the foundation installation drawing provided by the supplier, the user-supplied detailed list of auxiliary facilities and the purchase guide, make preparations for the installation of the equipment, and actively cooperate with the service personnel of the supplier. The gas path is laid to the designated position according to the actual requirements during installation, and all materials for production are prepared. If the test conditions are not met, the supplier test personnel will return.

4. The supplier's service personnel will leave the factory within 2-5 days after receiving the notice of the first installation or commissioning by the purchaser (for domestic customers and foreign customers within 900 kilometers).

5. Meet the contract delivery time required by the buyer. Equipment operation direction and appearance paint color can be requested by the demander.

6. The subsequent maintenance of the product or the accessories only cost the cost, and provide the buyer with * production process technical services.

设备安装调试期间,所产生的土、木、建及机械设备吊装费用均有需方负责 7. During the installation and commissioning of the equipment, the buyer shall be responsible for the costs of earth, wood, construction and machinery equipment lifting.

- 5日(不含路途往返,国外客户需方负责调试人员的往返机票及劳动报酬)需方负责调试人员的吃住及安全问题。 8. Under normal circumstances, the commissioning period is 3 to 5 days (excluding round trips, foreign customers need to be responsible for commissioning personnel's round-trip air tickets and labor compensation). The buyer is responsible for the accommodation and safety of the commissioning personnel.

Other recommended products

More
The above information is provided by the enterprise itself, and the authenticity, accuracy and legality of the information content are the responsibility of the relevant enterprise. Plastic Machinery Network does not assume any responsibility for this.
Tips: In order to avoid purchasing risks, it is recommended that you confirm the supplier's qualification and product quality before purchasing the product.
or

Favorite the shop

Please log in before collecting

prompt

Your message has been submitted successfully! We will reply you as soon as possible ~
product comparison QR code Feedback

Scan to visit mobile phone shops
Leave message